The civic centre will be planned to change. There are two maps: one is the existing and the other is the plan for new. Summarise the information by selecting and reporting the main features and compare the two maps.
The two maps illustrate the changes that need to be made in the civic centre. The first map shows the present status of the civic centre and the second map shows the suggested changes that need to be implemented. In general, the overall structure of the civic centre will remain the same with few alterations suggested in the second map. According to the second map, the car parking in the upper left corner will be demolished and a theatre will be built in its place. The car parking space in the upper right corner will be converted into a hotel and restaurant. The library will be removed and the exhibition hall will move from the lower-left corner to the lower right corner. The council office will be shifted from the lower central area to the lower-left corner and in place of the old council office, open park and underground parking will be constructed. Lastly, most of the area in the civic centre undergo modification except the concert hall and shopping centre. |
The two maps of the civic center in the present and its plan depicts the significant changes will be occurred over a period of time. Overall, this city will be transformed into a well-facilitated destination and more attractive place in regards to recreation during this period. Similarly, infrastructure and amenities will have increased, along with the town’s capacity to provide for tourists. The first map shows the present status of the civic center and the second one shows the suggested changes. To begin with, in present, the concert hall stand between the car park at the left and right side, which shopping center is on the south of it. To the south of concert hall is constructed a council office which is located in the middle of exhibition hall to the west and library to the east. Turning now to a new plan, the concert hall that will be remained almost with no change during the period. However, another major changes to the area were the theatre and hotel and restaurants will be relocated the west and the east car park respectively. The council office will be demolished and will be removed to the southwest of the city and will be replaced with the open park and underground car park. Moreover, exhibition will be converted to the opposite of the city, from the southwest to the southeast.
the two maps show the plan to renovate the civic centre. the first map illustrated the existing maps and the second one predicts how much change will happen in the next future. In case of the present time, not Avenue, the car park is on the Northwest corner, and another parking for a car on the right side as well as between both parking is the cinema. Moreover, on the left side is high Street and on the other side is Smith Street is located. In Victoria Avenue, the shopping centre and the library are situated on the North East side near the town hall and council office and the exhibition on the left side. However, in the future North Avenue will be many changes, both the car park will replace by the hotel and restaurant and cafe but, cinema will be in the same place. It is predicted that high Street and Smith Street will remain on the same side. In the Upcoming time, the library will be replaced with an exhibition which will be near to the shopping centre. At the same time, the library will be underground. Town Hall will not change its place, but the carpark will be underground near the town hall. Last but not least, the council office will be returned with the exhibition on the southwest corner. Overall, there are many changes compared to now in the future as well as cafe and hotel and restaurant will be built.
لطفا وارد شوید و نظر خود را ثبت نمایید.
نام | تعداد آزمون | میزان موفقیت | |
---|---|---|---|
َAmeneh Darvishzadeh | 1 | 100/00 % | |
Mehrad Hashemi | 1 | 100/00 % | |
Noushmehr Norsobhi | 1 | 100/00 % | |
محمدحسین میرزایی | 1 | 100/00 % | |
مهدی حسین پور آقائی | 1 | 100/00 % | |
Farnoush Toghiany | 21 | 98/36 % | |
zahra namdari | 46 | 98/21 % | |
یاسمن محمدی پور | 4 | 98/08 % | |
Tara Mohammadi | 3 | 96/43 % | |
yasaman mohamadipur | 51 | 95/86 % | |
مهدی هنرمند | 1 | 95/24 % | |
محمدجواد ملائی اردستانی | 3 | 94/44 % | |
Arzhang Saberi | 4 | 93/33 % | |
Soheila Karimi | 124 | 92/73 % | |
aram farhmand | 10 | 92/31 % | |
یاشار اسکندری | 98 | 91/14 % | |
عباس پورمیدانی | 1 | 90/00 % | |
پریسا سلوکی شهرضایی | 72 | 89/49 % | |
ارشیا قلمکاری | 33 | 89/23 % | |
Matin Azimipour | 30 | 88/17 % |